WORK SCHEDULED FOR THE WEEK OF 5/20/19:  

Anticipated Weekly Work Schedule from Pike Industries. All work is subject to change due to weather or other unforeseen delays.  

SPECIAL TRAFFIC CONSIDERATIONS FOR THE UPCOMING WEEK: Alternating one-way traffic patterns may occur at the location of active construction operations. A speed reduction zone (40 MPH) will be put in place throughout the length of the daily active construction zone. Speed limit reduction signs will be taken down at the end of each work day, and the speed reduction will not be in effect during non-work hours.    

Paving operations are dependent on weather and surface conditions, and the paving schedule is subject to change as a result.

Monday 5-20-19: ·         Continue final Bonded wearing course machine paving in Chester, VT working toward Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from Route 10 in Chester to the Ludlow/Cavendish town line. ·         Begin bridge plug joints in Chester, VT just north of Route 10, and continue to Shrewsbury, VT. ·         Flaggers and Uniformed Traffic Officers (UTOs) will assist with Traffic Control.

Tuesday 5-21-19: ·         Continue final Bonded wearing course machine paving in Chester, VT working toward Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from Route 10 in Chester to the Ludlow/Cavendish town line. ·         Begin bridge plug joints in Chester, VT just north of Route 10, and continue to Shrewsbury, VT. ·         Flaggers and UTOs will assist with Traffic Control.

Wednesday 5-22-19: ·         Final Bonded wearing course machine paving in Chester, VT working towards Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from Route 10 in Chester to the Ludlow/Cavendish town line. ·         Flaggers and UTOs will assist with Traffic Control.

Thursday 5-23-19: ·         Continue final Bonded wearing course machine paving in Chester, VT working toward Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from Route 10 in Chester to the Ludlow/Cavendish town line. ·         Begin bridge plug joints in Chester, VT just north of Route 10, and continue to Shrewsbury, VT. ·         Flaggers and UTOs will assist with Traffic Control.

Friday 5-24-19: ·         Continue final Bonded wearing course machine paving in Chester, VT working toward Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from Route 10 in Chester to the Ludlow/Cavendish town line. ·         Continue bridge plug joints in Chester, VT just north of Route 10 and continue to Shrewsbury, VT. ·         Flaggers and UTOs will assist with Traffic Control.

Saturday 5-25-19 – TBD ·         Continue final Bonded wearing course machine paving in Chester, VT working toward Ludlow village. Please be aware that there will be a numerous amount of trucks during paving operations. ·         Line Striping Targets (LST) will be used for temporary line delineation. ·         Temporary 40 MPH speed reduction package from oRute 10 in Chester to the Ludlow/Cavendish town line. ·         Flaggers and UTOs will assist with Traffic Control.

Route 155 Updates

DATE: Thursday, 5/16/19
PROJECT TYPE: Roadway, culvert, and slope remediation
LOCATION: Town of Mount Holly along Route 155. The project limits begin just south of Barlow Rd. and extend northerly about .1 mile and includes the two culverts within the project limits. Remaining project work includes embankment and roadway work.

PROJECTED COMPLETION: Summer 2019

SPEED REDUCTION ZONE:  A 40 mph speed reduction zone is in place through the project area. A one-way alternating traffic pattern will be in place as needed during active construction operations. Traffic control personnel will be onsite regulating the flow of traffic. 

WORK SCHEDULED FOR THE WEEK OF 5/20/19:
GENERAL: Work has resumed on the project with crews typically onsite Monday to Friday 7:00am to 5:00pm. Please be advised that equipment/trucks will be entering RT 155 from both Barlow Rd. and a construction entrance on the south end of the project.    

ROAD/SLOPE WORK: Work on this project is mostly contained to the slope adjacent to RT 155 at this time but on-roadway work is possible at any time. Motorists can expect daily lane closures along RT 155 within the project limits.

Please focus on safety when driving through the construction work zone and remember, it is against the law to use a hand held cell phone while driving in Vermont.